Custom Milling
   structural
   flooring
   siding
   finish work
Products
   bark & mulches
   compost & soil
   rock & gravel
   bricks & bounders
   reclaimed products
Erosion Control
   silt fencing
   slope stabilization
Material Recovery
   tip fees
   on-site grinding
   oregon recovery rate
Dismantling vs. Demolition
   astoria steam plant
   lewis & clark school
   pier III
Custom Excavating
   company history
Media
   recycling is better
   trails end
   new beginning
   where the water goes
Contact Us!
   location
Tip Fees

Tip Fees  ($10.00 min)

Description

Fee

Construction & Demolition Material (mix)

$76.50/ton

Clean Wood

$40.00/ton

Stumps

$20.00/yard

Dirt / Rock / Sod

$7.00/ton

Unprepared Concrete / Asphalt (pieces with metal, rebar, and/or over 3' x 3')

$13.00/ton

Prepared Concrete / Asphalt (pieces free of 1/4", metal, and/or under 3' x 3')

$7.00/ton

Scrap Metal

No Charge

Dirty Brush / Land Clearing Debris

$45.00/ton

Clean Brush / Yard Debris

$8.50/yard

Refrigerator / Freezer

$70.00/each

Oil Tank / Gas Tank (not empty)

$120.00/each

Propane Tank

$30.00/each

Truck Camper

$250.00/minimum

Camper Trailer (20' & under)

$300.00

Camper Trailer (21' & over)

$400.00

Tire (small car/truck)

$5.00/each

Tire w/rims (small car/truck)

$8.00/each

Tire (large truck)

$20.00/each

Tire w/rims (large truck)

$30.00/each

Car/Truck vehicle/or frame

$150.00/minimum

Batteries

$25.00/each

Note:  Prices are subject to change with fluctuating markets.